In some of these areas, the road ROWs are also adjacent to existing aboveground MVEC distribution lines, which are shown on maps in Appendix A. […] Great River Energy will require a new 100-foot-wide ROW for construction and maintenance of the Transmission Line. 2024 August 19, “LAKETOWN 115-kV TRANSMISSION LINE PROJECT IN CARVER COUNTY, MN”, in Great River Energy, page 30: