Some of the changes include: re-formatting the RFP to increase visual accessibility, overhauling the project proposal deliverables, increasing the “bite” of material compliance deductions associated with the Materials Notebook, placing a minimum freeboard design constraint on the canoe itself, re-introducing the calculations appendix, restricting the format of presentation slides, restricting the use of pigments and stains, tweaking the final product display, imposing a maximum unit weight requirement, and completely overhauling the scoring system. 2025 September 2, “2026 American Society of Civil Engineers Concrete Canoe Competiton Request for Proposals”, in ASCE, archived from the original on 07 Sep 2025, page 1:
(abbreviation, alt-of, initialism) Initialism of request for production.